Electricity transmission line from Bayswater Power Station to Mount Piper Power Station :

This statement examines the environmental impacts associated with the proposed construction of a 500 kV transmission line required to carry the bulk of the power generated at Bayswater Power Station to Mount Piper Power Station.

Data and Resources

  • 1 online resource with various pagination : illustrations, maps : 30 cm.

Metadata Summary What is metadata?

Field Value
Language English
Edition 1
Purpose Research
Frequency of change Not planned
Keywords 74210,Electric lines,Environmental impact statements,33653,Electric power distribution,51945,Environmental impact analysis.,102545,Environmental aspects,New South Wales
Metadata Date 2008-06-24
Date of Asset Creation 2008-06-24
License Creative Commons Attribution 4.0
Geospatial Topic Environment
Temporal Coverage From 2008-06-24