The Floodplain Management Plan divides the Cockrone Lagoon area into six precincts: Cockrone Lagoon - Beach Berm High Hazard Floodway/Investigation Cockrone Lagoon - Entrance...
-
Storage Volumes: The modelling showed that the approach developed for Terrigal and Wamberal Lagoons could be satisfactorily applied to Avoca Lagoon for the opening of 14...
-
Separate Flood studies have been undertaken for four coastal lagoons in the Gosford area, that is, Avoca, Cockrone, Terrigal and Wamberal Lagoons. Different analytical...
-
Cockrone Lagoon study outlines existing flood behaviour, environmental and planning considerations, flood damages assessment, flood plain management options and their impacts,...
-
Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the...
-
Report
-
Coastal Lagoon Catchments Overland Flood Study Final Report inc. appendices and figures
-
This Flood Study comprised the following principal stages: collection and assessment of available data; investigation of coastal processes to determine design ocean levels for...
-
Compendium of Data to studies conducted on Gosford Coastal Lagoons
-
Lagoon Opening data: Wamberal Lagoon and Avoca lake openings Automatic recorder levels Comparison of Wamberal lagoon openings Comparison of Terrigal lagoon openings Comparison...