-
Floodplain Risk Management Study and Plan June 2017
-
PDF report for the above project. Examines the suitability of the ARR2016 IFDs in areas with rapidly varying terrain such as Wollongong and Coffs Harbour. Recommends updated...
-
Complete report
-
This project was undertaken by consultant WMAwater for Federation Council. The final report was issued on 21 August 2024. It was one of the recommended actions arising from the...
-
The tool should be used in conjunction with the associated guide and with the assistance of the regional DCCEEW flood program representative. This tool has been updated December...
- ZIP
-
Complete
-
Data contains GIS files for: hydraulic category flood depth flood velocity flood water level provisional hazard Each folder contains full range of event magnitudes: 2yr ARI (50%...
- ZIP
-
Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the...
-
Complete report
-
The study was commissioned by Bayside Council, with the assistance of the NSW Government Office of Environment and Heritage (OEH). Additional information has been provided by...