Print

Identification

Field Value

Title

Stony Creek Flood Study

Abstract

The objectives of the Flood Study are to: • Identify all the flood-related data by searching all relevant data sources. • Determine the likely extent and nature of flooding and identify potential hydraulic controls by carrying out detailed site visits of the study area. • Define existing catchment condition flood behaviour for mainstream flooding in the catchment with due consideration to the impact of Lake Macquarie levels on flooding characteristics. • Define design flood levels, velocities and flow distributions for the catchment. • Define the extent of flooding for the 200 year, 100 year, 20 year, 10 year and 5 year ARI floods and Probable Maximum Flood (PMF) for the catchment. • Define Provisional Flood Hazard for the flood-affected areas. • Define the Hydraulic Categories for the flood-affected areas. Two numerical modelling tools were developed: • A hydrologic model to convert rainfall on the catchment into runoff. The hydrologic model combines rainfall information with local catchment characteristics to estimate runoff hydrographs. • A hydraulic model to convert runoff hydrographs into water levels and velocities throughout the study area. The model simulates the hydraulic behaviour of the water within the study area by accounting for flow in the major channels as well as all the potential overland flowpaths, which develop when the capacity of the channels is exceeded. It relies on boundary conditions, which include the runoff hydrographs produced by the hydrologic model and the appropriate downstream boundary level from Lake Macquarie.

Resource locator

Stony Creek - Flood Study December 2005

Name: Stony Creek - Flood Study December 2005

Protocol: WWW:DOWNLOAD-1.0-http--download

Function: download

Unique resource identifier

Code

d9e2d457-3d04-4065-acec-dbd3bd979b3d

Presentation form

Edition

15/09/2017

Dataset language

English

Metadata standard

Name

ISO 19115

Edition

2016

Dataset URI

https://datasets.seed.nsw.gov.au/dataset/d9e2d457-3d04-4065-acec-dbd3bd979b3d

Purpose

Land and Resource Management

Status

On going

Spatial representation

Type

vector

Spatial reference system

Code identifying the spatial reference system

4283

Classification of spatial data and services

Field Value

Topic category

Keywords

Field Value

Keyword set

keyword value

Originating controlled vocabulary

Title

ANZLIC Search Words

Reference date

2008-05-16

Geographic location

West bounding longitude

151.483612

East bounding longitude

151.598969

North bounding latitude

-33.048719

South bounding latitude

-32.965801

NSW Place Name

Stony Creek Catchment

Vertical extent information

Minimum value

-100

Maximum value

2228

Coordinate reference system

Authority code

urn:ogc:def:cs:EPSG::

Code identifying the coordinate reference system

5711

Temporal extent

Begin position

End position

N/A

Dataset reference date

Resource maintenance

Maintenance and update frequency

As needed

Contact info

Contact position

Data Broker

Organisation name

Lake Macquarie City Council

Telephone number

02 4921 0333

Email address

council@lakemac.nsw.gov.au

Responsible party role

pointOfContact

Constraints related to access and use

Field Value

Limitations on public access

Responsible organisations

Field Value

Responsible party

Contact position

Data Broker

Organisation name

Lake Macquarie City Council

Telephone number

02 4921 0333

Email address

council@lakemac.nsw.gov.au

Responsible party role

pointOfContact

Metadata on metadata

Field Value

Metadata point of contact

Contact position

Data Broker

Organisation name

Lake Macquarie City Council

Telephone number

02 4921 0333

Email address

council@lakemac.nsw.gov.au

Responsible party role

pointOfContact

Metadata date

2024-03-25T07:36:00.500316

Metadata language