Floodplain Management Study Spring Street Drain, Muddy Creek and Scarborough Ponds - Volume 1

Abstract

Objective

This Floodplain Management Study defines the nature and extent of the flood hazard in the three catchments. It also identifies and assesses strategies and measures aimed at reducing the impact of flooding on both existing and future development, and measures to prevent future development from making flooding worse.

The results of this Floodplain Management Study are being used to prepare a Floodplain Management Plan (FPMP). The objective of the FPMP is to establish a cost-effective floodplain management strategy for the area and to recommend a programme for implementation of the Plan.

The Study Brief is attached as Appendix A.

What is in the Study

The Floodplain Management Study and Plan will not totally eliminate flooding. Flooding is a natural phenomenon which cannot be fully controlled by human works. In fact, excessive artificial controls are likely to be very costly and to have adverse environmental effects. Therefore the Floodplain Management Study and Plan aim to provide a package of best management practices which give a balance between reducing flood hazard and flood damages, allowing appropriate development, and protecting and enhancing the environment of the floodplain.

This Report has been divided into the following sections:

  • Section 1: Introduction (page 1) Establishes the context and basis for the plan.
  • Section 2: Background (page 5) Describes the study process, including previous studies, and the background technical information which is available. It includes a review of the previous Muddy Creek Flood Studies.
  • Section 3: Existing Flood Behaviour (page 15) Summarises the available data and modelling results concerning flood behaviour.
  • Section 4: Social and Economic Impacts of Flooding (page 23) Examines the potential flood damages and other social and economic effects of flooding for a range of flood events, including an extreme flood.
  • Section 5: Choosing the Designated Flood (page 28) Discusses the issued to be considered by Council in choosing a designated flood for Rockdale, and recommends that the 1% AEP flood be adopted.
  • Section 6: Available Floodplain Management Options (page 35) Describes in broad terms the range of flood mitigation and other management works and other measures available to address the existing, future and residual flooding problems in the study area.
  • Sections 7, 8 and 9: Options for Management Areas (page 48) These three sections describe in detail, for the Muddy Creek, Spring St Drain and Scarborough Ponds catchments respectively, the feasible options and their likely benefits and costs.
  • Section 10: Assessment of Management Options (page 86) Reviews the financial aspects and the justification for the proposed management measures, identifies priorities and possible sources of funding. These issues will be further addressed in the future Floodplain Management Plan.
  • Section 11: References (page 90) Technical detail which supports the main report is provided in the Appendices, in Volume 2.

Resource locator

Spring Street Drain, Muddy Creek & Scarborough Ponds - Floodplain Management Study Vol 1 January 2000

Name: Spring Street Drain, Muddy Creek & Scarborough Ponds - Floodplain Management Study Vol 1 January 2000

Protocol: WWW:DOWNLOAD-1.0-http--download

Function: download

Unique resource identifier

Code

90f8b8bd-456d-4496-a842-80abd2456dcc

Presentation form

Edition

26/07/2017

Dataset language

English

Metadata standard

Name

ISO 19115

Edition

2016

Dataset URI

https://datasets.seed.nsw.gov.au/dataset/90f8b8bd-456d-4496-a842-80abd2456dcc

Purpose

Land and Resource Management

Status

On going

Spatial representation

Type

vector

Spatial reference system

Code identifying the spatial reference system

4283

Classification of spatial data and services

Field Value

Topic category

Keywords

Field Value

Keyword set

keyword value

Originating controlled vocabulary

Title

ANZLIC Search Words

Reference date

2008-05-16

Geographic location

West bounding longitude

151.109486

East bounding longitude

151.168897

North bounding latitude

-33.978498

South bounding latitude

-33.937642

NSW Place Name

Rockdale

Vertical extent information

Minimum value

-100

Maximum value

2228

Coordinate reference system

Authority code

urn:ogc:def:cs:EPSG::

Code identifying the coordinate reference system

5711

Temporal extent

Begin position

End position

N/A

Dataset reference date

Resource maintenance

Maintenance and update frequency

As needed

Contact info

Contact position

Data Broker

Organisation name

Bayside Council

Full postal address

council@bayside.nsw.gov.au

Email address

council@bayside.nsw.gov.au

Responsible party role

pointOfContact

Constraints related to access and use

Field Value

Limitations on public access

Responsible organisations

Field Value

Responsible party

Contact position

Data Broker

Organisation name

Bayside Council

Full postal address

council@bayside.nsw.gov.au

Email address

council@bayside.nsw.gov.au

Responsible party role

pointOfContact

Metadata on metadata

Field Value

Metadata point of contact

Contact position

Data Broker

Organisation name

Bayside Council

Full postal address

council@bayside.nsw.gov.au

Email address

council@bayside.nsw.gov.au

Responsible party role

pointOfContact

Metadata date

2024-03-25T06:42:52.049869

Metadata language