Title

Floodplain Risk Management Study and Plan Report Cessnock City (Black Creek) - Report

Abstract

Cessnock City Council has engaged Cardno (NSW/ACT) Pty Ltd to prepare the Black Creek Floodplain Risk Management Study and the Black Creek Floodplain Risk Management Plan in accordance with the NSW Government Floodplain Development Manual (NSW Government, 2005). Flooding in the catchment can pose a hazard to residents and businesses near the creeks, channels and overland flow paths.

The purpose of this study is to identify and examine options for the management of flooding within the Black Creek catchment.

The purpose of this plan is to document a strategy of suitable actions for implementation. The Black Creek catchment is located within the Cessnock Local Government Area (LGA) and comprises all urban areas including the Cessnock Central Business District (CBD) and surrounding suburbs. Black Creek has several tributaries, including Bellbird Creek, Lavender Creek, Limestone Creek, Kearsley Creek and Aberdare Creek. Other tributaries include the Oliver Street channel in South Cessnock and the East Cessnock Drain. These tributaries flow through rural areas towards Cessnock and generally comprise concrete lined trapezoidal channels in the urban areas. Given the numerous creeks converging in Cessnock, flooding has occurred regularly including in 1949, 1977, 1990, 1992 and 2007.

As part of this study, the existing hydrological and hydraulic models developed as part of the Black Creek Flood Study (DHI, 2010) were extended to include areas outside of the Cessnock CBD where limited information on flooding behaviour existed including Bellbird, Mount View detention basin and surrounds and northeast of the CBD. Up-to-date ground survey information was collected in 2011 and was used to represent the terrain in the hydraulic model. Flood modelling was undertaken for seven design storm events ranging from the 20% Annual Exceedance Probability (AEP) event up to the Probable Maximum Flood (PMF) event in order to assess flood behaviour in the extended hydraulic model.

A number of key differences from the DHI (2010) study resulted from the extension of the hydraulic model and incorporation of up-to-date survey information including a reduction in 1% AEP flood levels ranging from 0.2m to 0.5m along Bellbird Creek and a reduction in flood levels of 0.2m along East Cessnock Drain. The updated hydraulic model provides detailed information on flood behaviour and overland flow paths in the vicinity of Mount View detention basin and through the urban areas of Cessnock. The revised flood extents were adopted by Council in March 2014.

An assessment was undertaken on the number of properties that would be subject to overground and overfloor flooding within the floodplain under various design storm events ranging from the 20% AEP event up to the PMF.

Options to reduce or manage the effects of flooding in the catchment were investigated to manage the risks of flooding. Under the merits-based approach outlined in the NSW State Government’s Floodplain Development Manual (NSW Government, 2005) a number of potential options for the management of flooding were identified, namely:

  • Flood modification measures (FM Options);

  • Property modification measures (P Options);

  • Emergency response modification measures (EM Options).

An extensive list of options was assessed against a range of criteria (technical, economic, environmental and social) and hydraulic modelling of some of the flood mitigation options was undertaken to provide a comprehensive analysis of those options that would involve significant capital expenditure.

The highest ranking options identified by the multi criteria analysis include:

  • FM5, proposed bund/flood wall east of Sixth Street properties and railway line in South Cessnock;

  • EM4, Public awareness and education;

  • EM5, Flood warning signs at critical locations;

  • P6, Land Swap;

  • P3, House Raising;

  • P4, House Rebuilding;

A number of structural options assessed were not considered viable either due to:

  • adverse impacts on flood levels such as Option FM2 (A combination of a detention basin, a bund and channel reshaping along Bellbird Creek);

  • where the cost benefit ratio indicated the cost of implementing the option were much higher than the resultant reduction in flood damages, including:

  • Option FM1 (Combination of detention basins along Black Creek);

  • Option FM3 (A combination of channel widening, channel reshaping and culvert upgrades on Black Creek);

  • Option FM4 (Channel widening of the existing Oliver Street channel at South Cessnock);

  • Option FM6 (Detention Basin at Austar Coal Mine Site on Bellbird Creek upstream).

The ranking is used as the basis for prioritising the components of the Floodplain Risk Management Plan It is noted that scoring adopted is not absolute and the proposed scoring and weightings used should be reviewed in future.

The Floodplain Risk Management Plan (Chapter 15) represents the proposed implementation plan of actions for the management of flood risks in the Black Creek Floodplain. The action list contains a mix of approaches to managing flood risks with a priority system of high, medium and low for implementation of the actions.

Resource locator

Cessnock City (Black Creek) Floodplain Risk Management Study and Plan Report

Name: Cessnock City (Black Creek) Floodplain Risk Management Study and Plan Report

Protocol: WWW:DOWNLOAD-1.0-http--download

Function: download

Unique resource identifier

Code

6f8e5753-2190-43f9-9bb2-aa4f68188c22

Presentation form

Edition

16/06/2021

Dataset language

English

Metadata standard

Name

ISO 19115

Edition

2016

Dataset URI

https://datasets.seed.nsw.gov.au/dataset/6f8e5753-2190-43f9-9bb2-aa4f68188c22

Purpose

Land and Resource Management

Status

On going

Spatial representation

Type

vector

Spatial reference system

Code identifying the spatial reference system

4283

Classification of spatial data and services

Field Value

Topic category

Keywords

Field Value

Keyword set

keyword value

Originating controlled vocabulary

Title

ANZLIC Search Words

Reference date

2008-05-16

Geographic location

West bounding longitude

151.315041

East bounding longitude

151.380959

North bounding latitude

-32.857383

South bounding latitude

-32.817575

NSW Place Name

Cessnock

Vertical extent information

Minimum value

-100

Maximum value

2228

Coordinate reference system

Authority code

urn:ogc:def:cs:EPSG::

Code identifying the coordinate reference system

5711

Temporal extent

Begin position

End position

N/A

Dataset reference date

Resource maintenance

Maintenance and update frequency

As needed

Contact info

Contact position

Data Broker

Organisation name

Cessnock City Council

Full postal address

council@cessnock.nsw.gov.au

Email address

council@cessnock.nsw.gov.au

Responsible party role

pointOfContact

Constraints related to access and use

Field Value

Limitations on public access

Responsible organisations

Field Value

Responsible party

Contact position

Data Broker

Organisation name

Cessnock City Council

Full postal address

council@cessnock.nsw.gov.au

Email address

council@cessnock.nsw.gov.au

Responsible party role

pointOfContact

Metadata on metadata

Field Value

Metadata point of contact

Contact position

Data Broker

Organisation name

Cessnock City Council

Full postal address

council@cessnock.nsw.gov.au

Email address

council@cessnock.nsw.gov.au

Responsible party role

pointOfContact

Metadata date

2024-03-25T06:27:37.719765

Metadata language